Laserfiche WebLink
SCHEDULE "A" <br /> <br /> ROAD <br />1. Division Road <br /> <br />2. County Road #8E <br /> <br />3. County Road #46 <br /> <br />4. County Road #46 <br /> <br />5. County Road #27 <br /> <br />6. County Road #27 <br /> <br />7. County Road #27 <br /> <br />8. County Road #27 <br /> <br />TOTAL <br /> <br />RESURFACING <br /> <br />2" hot mix asphalt resurfacing <br />from 4th Concession Gosfield <br />South Township to the curve at <br />Highway #3 <br /> (2.4 miles) <br /> <br />2½" hot mix asphalt resurfacing <br />from Consolidated Rail to County <br />Road #23, Town of Essex <br /> (0.35 miles) <br /> <br />2" hot mix asphalt resurfacing <br />east limits of Comber to County <br />Road #37 <br /> (2.1 miles) <br /> <br />2" hot mix asphalt <br />County Road #37 to <br /> <br />resurfacing <br />County Road <br /> <br />(4.1 miles) <br /> <br />2" hot mix asphalt <br />County Road #42 to <br />River <br /> <br />resurfacing <br />Town of Belle <br /> <br />(0.8 miles) <br /> <br />2" hot mix asphalt resurfacing <br />County Road #46 to South Malden <br />Road, Township of Rochester <br /> <br />1" dense graded asphalt resurfacing <br />through South Woodslee <br /> (0.4 miles) <br /> <br />2" hot mix asphalt resurfacing <br />from South Woodslee to County <br />Road #8 <br /> (1.5 miles) <br /> <br />TOTAL COST <br /> <br />$127,000.00 <br /> <br />$ 27,000.00 <br /> <br />$116,000.00 <br /> <br />$229,000.00 <br /> <br />$ 44,000.00 <br /> <br />$ 50,000.00 <br /> <br />$ 24,000.00 <br /> <br />$ 83~000.00 <br />$700,000.00 <br /> <br /> <br />