My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008 Performance Measures (MPMP)
COE-Web
>
PUBLIC DOCUMENTS
>
Document Archives
>
Financial Documents
>
Municipal Performance Measures
>
2008 Performance Measures (MPMP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 10:55:31 AM
Creation date
6/25/2014 1:25:34 PM
Metadata
Fields
Template:
F - Finance and Accounting
F - Finance and Accounting - Date
9/1/2009
Type of Document
Report
F - Finance and Accounting - Description
Municipal Performance Measures 2008 Results
F - Finance and Accounting - Department
Finance
Supplemental fields
Type
Financial Statements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORPORATION OF THE COUNTY OF ESSEX <br />Municipal Performance Measurement Program . 2008 RESULTS <br />Local Government <br />2008 2007 2006 2005 <br />4.4% 4.3% 4.5% 4.5% <br />Efficiency Measure — Operating costs for governance and corporate management as a <br />percentage of total municipal operating costs. <br />Objective — Efficient municipal government. <br />Notes: Operating costs for municipal administration in 2008 = $3,949,580. Total municipal operating costs in 2008 = <br />$89,401,829. <br />The formula for the local government measure was changed in 2007 to align it with the formula for operating costs <br />used by other efficiency measures. The 2006 & 2005 measures were calculated using the revised formula. <br />Roadways <br />2008 2007 2006 2005 <br />$773.40 $655.32 $682.30 $549.31 <br />Efficiency Measure — Operating costs for paved (hard top) roads per lane kilometre. <br />Objective — Efficient maintenance of paved roads. <br />Notes: Total 2008 operating costs for paved roads = $1,162,415. Total lane kilometres for the County of Essex = <br />1,503. <br />Formulas for all efficiency measures were changed in 2005 to improve the definition of operating costs. <br />2008 2007 2006 2005 <br />$1 $1 $589.32 $1 <br />Efficiency Measure - Operating costs for winter maintenance of roadways per lane kilometre <br />maintained in winter. <br />Objective - Efficient winter maintenance of roads. <br />Notes: Total winter control costs for 2008 = $2,883,645. Total lane kilometres for the County of Essex = 1,503. <br />Formulas for all efficiency measures were changed in 2005 to improve the definition of operating costs. <br />2008 2007 2006 2005 2004 2003 <br />83.7% 82.2% 78.0% 73.9% 71.4% 70.0% <br />Effectiveness Measure - Percentage of paved lane kilometres where the condition is rated as <br />good to very good <br />Objective - Pavement condition meets municipal objectives <br />Notes: Total number of paved lane kilometres tested = 1,503. Total number of paved lane km rated as good to very <br />good = 1,258. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.