My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007 Performance Measures (MPMP)
COE-Web
>
PUBLIC DOCUMENTS
>
Document Archives
>
Financial Documents
>
Municipal Performance Measures
>
2007 Performance Measures (MPMP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 10:55:31 AM
Creation date
6/25/2014 1:25:33 PM
Metadata
Fields
Template:
F - Finance and Accounting
F - Finance and Accounting - Date
1/1/2007
Type of Document
Report
F - Finance and Accounting - Description
2007 Performance Measures (MPMP)
F - Finance and Accounting - Department
Finance
Supplemental fields
Type
Financial Statements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORPORATION OF THE COUNTY OF ESSEX <br />Municipal Performance Measurement Program • 2007 RESULTS <br />Local Government <br />., ~ . <br />2007 2006 2005 <br />4.3% 4.5% 4.5% <br />Efficiency Measure -Operating costs for governance and corporate management as a <br />percentage of total municipal operating costs. <br />Objective -Efficient municipal government. <br />Notes: Operating costs for municipal administration in 2007 = $3,650,678. Total municipal operating costs in 2007 = <br />$84,505,432. <br />The formula for the local government measure was changed in 2007 to align it with the formula for operating costs <br />used by other efficiency measures. The 2006 & 2005 measures were calculated using the revised formula. <br />Roadways <br />.. ,.,., <br />2007 2006 2005 <br />$655.32 $682.30 $549.31 <br />Efficiency Measure -Operating costs for paved (hard top) roads per lane kilometre. <br />Objective -Efficient maintenance of paved roads. <br />Notes: Total 2007 operating costs for paved roads = $984,948. Total lane kilometres for the County of Essex = <br />1,503. <br />Formulas for all efficiency measures were changed in 2005 to improve the definition of operating costs. <br />~ -~,~ <br />2007 2006 2005 <br />$1, 345.62 $589.32 $1, 409.40 <br />Efficiency Measure -Operating costs for winter maintenance of roadways per lane kilometre <br />maintained in winter. <br />Objective -Efficient winter maintenance of roads. <br />Notes: Total winter control costs for 2007 = $2,022,472. Total lane kilometres for the County of Essex =1,503. <br />Formulas for all efficiency measures were changed in 2005 to improve the definition of operating costs. <br /> <br />2007 2006 2005 2004 2003 2002 <br />82.2% 78.0% 73.9% 71.4% 70.0% 72.3% <br />Effectiveness Measure - Percentage of paved lane kilometres where the condition is rated as <br />good to very good <br />Objective -Pavement condition meets municipal objectives <br />Notes: Total number of paved lane kilometres tested =1,503. Total number of paved lane km rated as good to very <br />good =1,235. <br />
The URL can be used to link to this page
Your browser does not support the video tag.