My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011 Performance Measures (MPMP)
COE-Web
>
PUBLIC DOCUMENTS
>
Document Archives
>
Financial Documents
>
Municipal Performance Measures
>
2011 Performance Measures (MPMP)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2023 10:55:32 AM
Creation date
6/25/2014 1:25:42 PM
Metadata
Fields
Template:
F - Finance and Accounting
F - Finance and Accounting - Date
9/1/2012
Type of Document
Report
F - Finance and Accounting - Description
2011 Performance Measures (MPMP)
F - Finance and Accounting - Department
Finance
Supplemental fields
Type
Financial Statements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CORPORATION OF THE COUNTY OF ESSEX <br />Municipal Performance Measurement Program (MPMP) a 2011 RESULTS <br />CONTACT PERSON FOR ROADS: <br />4.1 PAVED ROAD — EFFICIENCY <br />2011 <br />2010 <br />2009 m <br />2011 2010 <br />4.1 a) <br />Xy <br />Operating costs for paved (hard top) <br />Operating costs for bridges and <br />roads per lane kilometre. $ 6,487.45 <br />$ 6,819.54 <br />$ <br />8,000.13 <br />$ 6.52 <br />$ <br />12.03 <br />`2 <br />area. <br />4.1 b) Total costs for paved (hard top) roads <br />4.3 b) <br />per lane kilometre. <br />$ 10,156.33 <br />$ 10,148.36 <br />$ <br />11,225.89 <br />per square metre of surface area. <br />$ 58.90 <br />$ 41.37 <br />$ <br />42.51 <br />OBJECTIVE: <br />Efficient maintenance of paved roads. <br />Efficient maintenance of bridges and culverts. <br />NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS: <br />NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS: <br />4.1 a) <br />Total 2011 operating costs for paved roads = $9,750,630. <br />Total square metres of surface area on bridges and culverts = 32,205. <br />Total lane kilometres for the County of Essex = 1,503. <br />4.3 b) <br />2011 total costs for bridges and culverts = $1,896,824. <br />4.1 b) <br />Total 2011 costs for paved roads = $15,264,958. <br />REFERENCE: <br />REFERENCE: <br />Total costs means operating costs as <br />defined in MPMP plus amortization and interest on long -term debt. <br />e The efficiency measure based on total costs was introduced in 2009. Total <br />costs means operating costs as <br />9 Financial Information Return: 91 2130 35 (Operating costs measure) and 91 2130 45 (Total costs measure). <br />defined in MPMP plus amortization and interest on long -term debt. <br />e Financial Information Return: 91 2111 35 (Operating costs measure) and 91 2111 45 (Total costs measure). <br />4.3 BRIDGES AND CULVERTS — EFFICIENCY <br />2011 2010 <br />2009 <br />4.3 a) <br />Operating costs for bridges and <br />culverts per square metre of surface <br />$ 21.68 <br />$ 6.52 <br />$ <br />12.03 <br />`2 <br />area. <br />4.3 b) <br />Total costs for bridges and culverts <br />per square metre of surface area. <br />$ 58.90 <br />$ 41.37 <br />$ <br />42.51 <br />OBJECTIVE: <br />Efficient maintenance of bridges and culverts. <br />NOTES & KEY FACTORS FOR UNDERSTANDING RESULTS: <br />4.3 a) <br />2011 operating costs for bridges and culverts = $698,093. <br />Total square metres of surface area on bridges and culverts = 32,205. <br />4.3 b) <br />2011 total costs for bridges and culverts = $1,896,824. <br />REFERENCE: <br />e The efficiency measures for bridges and culverts were introduced in 2009. <br />Total costs means operating costs as <br />defined in MPMP plus amortization and interest on long -term debt. <br />9 Financial Information Return: 91 2130 35 (Operating costs measure) and 91 2130 45 (Total costs measure). <br />
The URL can be used to link to this page
Your browser does not support the video tag.